Demag KBK Multi Crane System for Engine Block Machining Application


Automobile manufacturer Nissan needed a way to safely move engine blocks into position for machining. To meet peak production requirements the ability to handle up to 18 blocks at the same time was required.
Download Case Study
Demag KBK Multi Crane System for Engine Block Machining Application
Demag

Laura Antenucci, Marketing Manager
440-248-2400

Visit Website
Monorail Manufacturers Association, Inc.